New, high quality office units available close to Stansted Airport

Frogmore Logo

Specification

Production Area

  • Single storey portal frame – 7m min. to haunch (6m min. clear to part Units 2, 8, 11 and 17)
  • Electrically operated sectional overhead goods door with level access
  • Power-floated concrete floor with 30kN/sq m floor loading
  • 3 phase electrical supply (up to 100kVA)
  • Fire alarm to suit shell
  • Incoming mains services (gas, water and electricity)
  • Ducting for telecom services
  • Provision of disabled toilet facilities with water supply
  • Dedicated car parking
  • Concrete loading apron with protection bollards
  • External security lighting
  • Cycle racks and shelters
  • High quality soft landscaping provision

Office Area

  • Office area at first floor level
  • Suspended ceilings
  • CAT 3 recessed fluorescent lighting
  • Carpet tiles
  • Perimeter skirting trunking (no cabling)
  • VRV system comfort-cooling/heating

Office Floor Areas

The areas have been calculated in accordance with RICS Code of Measuring Practice 6th edition.